Work Description

Tirtha Chowk to Sudhapal Road Length 3.10 Km.

In the said work, Tirtha and Sudhapal villages have been connected by a paved road.

  • This work was sanctioned on 20-10-2022.
  • The sanctioned amount for this work is ₹268.47.
bastar logo